Cost · PVC dormer
What does a PVC dormer cost?
PVC is the most common cladding on prefab dormers in the Netherlands and the UK. It is also the most price-competitive option — but the spec sheet matters more than the headline number.
5 min leestijd·Onafhankelijke informatie
Short answer
A 3-metre PVC dormer with HR++ glazing typically lands between €8,500 and €14,000 installed. Multi-wall PVC profile systems and PVC-Trespa hybrids sit at the top; basic single-wall PVC sits at the bottom.
Realistic price ranges
- Basic single-wall PVC, 3 m: €8,500–€10,500.
- Multi-wall PVC profile, 3 m: €10,500–€12,500.
- PVC-Trespa hybrid, 3 m: €12,000–€14,000.
- Add per extra metre: €1,500–€2,200.
What drives the price
- Profile system (single-wall, multi-wall or hybrid with Trespa).
- Insulation Rc value — Rc 4.5 baseline, Rc 6.0+ pushes price.
- Glazing: HR++ baseline, triple adds €400–€800.
- Lead apron, zinc trim and gutter style.
- Crane access and street logistics.
PVC vs timber
PVC wins on purchase price and short-term maintenance: no paint cycles, easy cleaning. Timber wins on repairability and lifetime cost — a damaged PVC panel often means replacing a whole face, while timber can be patched and repainted indefinitely.
What to watch for in a PVC quote
FAQ
FAQ
Veelgestelde vragen
3 vragen · klik om te openen
01What does a PVC dormer cost in 2026?
Indicatively €8,500–€14,000 for a 3-metre PVC-clad dormer with HR++ glazing, depending on profile system, insulation level and finish.
02Is PVC always cheaper than timber?
On purchase price, yes — usually 20–35% less. Over decades the gap narrows because PVC cladding tends to need replacement before timber does, especially on south-facing roofs.
03How long does PVC cladding last on a dormer?
Modern multi-wall PVC and PVC-Trespa hybrids last 25–35 years if installed with proper ventilation gaps. Without ventilation, UV and heat shorten that to 15–20 years.
Conclusie
PVC is a defensible choice when the spec is honest. Insist on a named profile system, a documented Rc value and a ventilated cladding detail — and the lowest price stops being a gamble.
